A Small Office Move: Your London Relocation Checklist
October 9, 2026
Choose one person to coordinate the office move and give them a deputy. Staff need a clear answer about when to pack, what travels and where each desk will be at the new site. Too many separate instructions quickly become confusing.
Build the move list around people returning to work: furniture, boxed equipment, records and the systems they need. This checklist covers a straightforward London office relocation. Keep specialist equipment and technical migration tasks with their responsible people, and use one current floor plan for the receiving team.
Step 1: Choose one move coordinator
Name the person who will keep the plan up to date and confirm decisions. Give them a deputy who can answer questions if they are unavailable. Staff, building management and the removal provider should know who to contact.
Create a shared task list with the task, owner, due date and status. Keep decisions in one place instead of spreading them across separate messages. Distinguish confirmed arrangements from proposals, especially where access times or delivery bookings are still being negotiated.
Example: “Book goods lift — owner: office manager — due: before collection date — status: awaiting building approval”. This makes the blocker visible and gives someone responsibility for resolving it.

Step 2: Define the move and business priorities
List the teams relocating, the equipment moving and anything staying behind. Identify the functions that must continue during the transition, such as customer calls, order processing or essential administration.
Agree a realistic working arrangement during the move. Some staff may work elsewhere while the space is unavailable, but confirm what they need to do their jobs. Do not assume that everyone can work normally while their computer and documents are packed.
Set the move window around the access arrangements and your business requirements. Ask about out-of-hours availability if useful, but confirm it with the provider and both buildings before telling staff the date is final.
Step 3: Inventory furniture and equipment
Count desks, chairs, cabinets, monitors, printers and boxes. Record measurements for bulky furniture and note anything heavy, delicate or difficult to dismantle. Send the removal provider photographs and a clear inventory.
Decide which furniture will actually be used in the new office. A desk that fits the old room may not suit the new layout. Separate items for reuse, storage or another destination and label them clearly so they cannot be confused with the main move.
Check cabinets before moving them. Discuss whether they must be emptied and how their contents should be packaged. Do not assume that a loaded cabinet can be safely transported as it stands.
Step 4: Prepare the new layout
Draw a simple floor plan showing departments, desks and storage positions. Number desk locations so labelled equipment can go straight to the correct place. Give the delivery team a copy and keep another available at the entrance.
Check entrances, internal doors, corridors and any goods lift against the dimensions of large items. Ask building management about delivery rules, protection requirements and access hours. Confirm who will arrange any parking or loading permissions.
Keep the layout practical. Leave access routes clear and ask the appropriate person to assess workplace arrangements where needed. Moving furniture into a room does not automatically mean the workspace is ready for use.
COMFORTVAN • QUICK GUIDE
Office move: four readiness checks
Assign an owner to every workstream.
PEOPLE
Coordinator named; staff briefed.
PREMISES
Access and floor plan confirmed.
EQUIPMENT
Inventory, protection and IT handover agreed.
RESTART
Delivery checked; essential systems tested.
Step 5: Plan IT disconnection and reconnection
Assign equipment preparation to your IT contact or the person responsible for it. They should decide the backup, shutdown, packaging and reconnection process for the systems involved. Specialist infrastructure needs specialist handling.
Photograph cable arrangements and label each workstation’s equipment. Pack suitable accessories together so staff do not arrive to find a monitor without its power supply. Protect screens and follow the relevant manufacturers’ transport instructions.
Use a desk code on equipment and accessories: “B04 monitor; leads in B04 accessory pack”. Put the same code on the destination floor plan. The receiving team can then place the kit without needing staff or customer names on public labels. Before shutdown, have the responsible person photograph the connections and check that small adapters are on the equipment list too.
Confirm internet and other essential services at the new premises separately from the physical move. Test arrangements before the relocation where possible, and plan what staff will do if connectivity is delayed.
Office move: workstation box label
| Field | Fill before collection |
|---|---|
| Workstation reference | Use the desk or team reference from your inventory. |
| Contents | List equipment on the controlled inventory. |
| Destination | Room and workstation at the new office. |
| Handover | Name the receiving person and mark the box checked when received. |
Step 6: Assign responsibility for confidential records
Ask the responsible person in your business how confidential records should be packaged, tracked and handed over. Keep those records separate from ordinary stationery and avoid detailed sensitive descriptions on labels.
Identify who is authorised to handle the containers and who will receive them. Use your organisation’s existing information-security procedures rather than inventing a new process on moving day. Tell the removal provider about any agreed handling requirements without sharing unnecessary document contents.
Plan the secure destination before collection. A locked records container should not arrive at a new office with no agreed place or responsible recipient. Raise regulatory or legal questions with the appropriate adviser.
Step 7: Confirm the removal booking in writing
Discuss the full inventory, both addresses, floors, lifts and carrying distances with the provider. Clarify packing, dismantling and reassembly requirements, the number of movers and any restrictions on the schedule.
Ask for a quotation showing what is included and how changes will be priced. Agree what happens if building access is delayed or the inventory changes. Confirm relevant transport and cover terms for the equipment you are moving.
See ComfortVan’s office removals service to discuss the physical relocation. If you need other premises or stock moved, explain those requirements through our commercial removals service rather than assuming they fit the same booking.
Step 8: Brief staff before packing starts
Give staff a short instruction sheet with the packing deadline, desk codes, essentials they should keep and their working arrangements during the move. Explain who can answer questions and where updates will be shared.
Provide boxes and labels early enough for the agreed preparation. Tell staff what they should not disconnect or dismantle themselves. Mark items staying behind clearly, and do a final walk-through with the coordinator before collection.
Notify customers and suppliers about changes that affect them through your normal business channels. Assign address updates to the appropriate team and verify the relevant official processes when registered or contractual details change.
Step 9: Check delivery and test the workspace
Have someone available at the new office with the floor plan. Record delivery by item or container number and direct furniture to its destination. Raise obvious discrepancies before the team leaves where practical.
After reconnection, test the functions staff need: network access, calls, printing and important systems. Record faults with an owner and next step. Tell staff when the office is ready instead of treating the arrival of the last box as the only completion test.
Move-day completion checklist
- Coordinator and deputy available.
- Building access and loading agreed.
- Inventory and floor plan accessible.
- Equipment labelled and protected.
- Confidential-record handover assigned.
- Essential systems tested after delivery.